Fencing Post-1
• Steel grade: G300/G350
• Size: 100UC 150UC 200 UC 100PFC 125 PFC 150 PFC
• Length: 900-5800mm
• Surface: HDG Standard AS/NZS4680
• Warranty: Min. 25 years
• FOB Qingdao: USD 900/Ton
• Production Capacity: 1000 tons/Month
• Leading time: 20-45 days
• Package: Bundled by steel straps, steel RHS pipe at bottom
DETAILS
100 PFC Fencing Post prime cut for Australia Market
◆ Company Profile
HDG 100PFC Fencing post fabricated by Qingdao SuperM Steel Co.,Ltd, specical to Australia,NZ market. Also can be used as fencing post etc,more than 10 years export experiences.Got good reputation from our client.
◆ SuperM Steel HDG steel post features:
Hot Dip Galvanized to AS/NZ 4680:2006
Grade 300/G350
Customersized length from 0.9m to 4.8m with 300mm increment.
◆ Processing & Production:
1 prime saw cutting the certain length as order request
2 punching holes at the exactly area according to drawings
3 bending angles as request
4 welding Rebars/Flat bar/Angle bar/ steel parts according drawings.
5 surface polishing---welding spatters, splash, burrs, etc .
6 surface hot dipped galvanized.
7 packing by steel strips, each bundle 1.5-2 tons
8 container loading
◆ Product Description
steel grade | G300, G350, Q345B, Q235B |
Surface treatment | HDG, Min. 85um, Standard AS4680/2006 |
Size | 100UC 150UC 200 UC |
Length | 900mm~4800mm, incremental 300mm |
processing | prime saw cutting--- punching---welding---polishing---hot dipped galvanizing----packing |
package | bundled by steel strips, each bundle 1-2 tons for easier loading & unloading by forklift |
usage | concrete sleeper retaining wall post, farm fence post |
capacity | 600-1000tons / month |
◆ Quality Control
1. QC processing:
1. Every 3 months meeting for Quality Audit to solve the weakness during processing and procedures
2. Every 6 months meeting for employee training.
3. Producing as to the International Steel Structure Standard with ISO 9001 Quality Control System
4. Each project, every 6 months, connecting with clients for feedback and complaints, then improve the quality control actions.
5. Quality inspection report for every process during production. Ensure 100% good quality products.
◆ Company Certificate of us:
◆ Partnership Progressa
◆ Production Progress
Qingdao SuperM Steel Company design, supply & install steel structure buildings(steel structure workshop, steel structure warehouse buildings, steel structure hangar)
More than 10-year experiences.
1. Prepare Material⇒2. CNC Flame Cutting⇒3. Assembling⇒4. Submerged arc welding⇒5. Hand welding⇒6. Testing⇒7. Shot blasting⇒8. Painting⇒9. Packaging ⇒10. Loading container⇒11. Shipping⇒12. Customer installation
◆ Project Cases
◆ Our Customers
◆ FAQ
Q:Can you provide product catalog and quotation?
A: It is better if you can provide drawings(PDF or CAD),we will give you complete your drawings offer. or We can design as the request from you, then proposal.
Q:what is you used drawing format?
A: PDF or DWG as AUTO CAD file
Q:What is the minimun order quantity?
A:No MOQ limited.
Q:What is your packing?
A:Standard export package for container transportation by sea and can be packed as customer's requested.
Q:How long is the delivery time?
A:According to project situation, usually within 30 days after receiving deposit.
Q:What is your payment?
A:T/T , 30-70 or LC at sight.
Q: Do you company offer Guide installation at project site ?
A: Yes, usually we will send you the detailed installation drawing, if you need, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas.
FREE INQUIRY NOW
If you have any questions or needs about the product, please fill in the following form and we will contact you as soon as possible.